Strategy Documents - Bus
31st October 2010
Following on from a Pre-Feasibility and STAG Part 2 Report on potential options for an orbital bus system (EOBRT) in Edinburgh, this report discusses the options for a new link between Lothianburn and Straiton P&R sites. It sets out the highway engineering preliminary design and associated costs, examines the traffic engineering and junction amendments required for the two Sections of the EOBRT route examined in this study, drawing conclusions and making recommendations.
Strategy Documents - Bus
25th August 2010
Following on from a Pre-Feasibility and STAG Part 2 Report on potential options for an orbital bus system (EOBRT) in Edinburgh, this report presents an analysis of the data collected from the traffic surveys and the findings from the congestion analysis.
Strategy Documents - Bus
12th October 2009
This report sets out the results of the proposed EOBP linking key sites in the area
Strategy Documents - Bus
12th October 2009
Environmental Report relating to the Stage two appraissal of the Edinburgh Orbital Bus Project (EOBP)
Strategy Documents - Bus
12th October 2009
EXecutive Summary of the Stage two appraissal of the Edinburgh Orbital Bus Project (EOBP)
Strategy Documents - Bus
12th October 2009
Stage two appraissal of the Edinburgh Orbital Bus Project (EOBP)
Strategy Documents - Bus
01st September 2009
SEStran Bus Passenger Information Study
Strategy Documents - Bus
01st February 2008
Review and Recommendations for Alternative Fuel Use within the SEStran Area.
Strategy Documents - Bus
01st February 2009
This document is the second of four covering separate Issues for the SEStran Bus Initiatives project.
Strategy Documents - Bus
01st October 2008
This document is the third of four covering separate Issues for the SEStran Bus Initiatives project. It deals with Value for Money, assessing the different quality standards in the area and relating these to fares.
Strategy Documents - Bus
01st July 2008
This is the fourth in a series of task notes contributing to the Bus Initiatives Project for SEStran.
Strategy Documents - Bus
08th December 2008
This study assesses the potential for linking local bus services with rail at the new Alloa station. It assesses what impact this may have on the bus network and existing passengers as well as what level of patronage is likely to interchange between bus and rail at Alloa.Additionally, the study investigates the potential alterations to the management of the road network and the provision of bus infrastructure and facilities in Alloa town centre, to allow better integration between bus and rail and to improve access to the town centre by bus.
Strategy Documents - Bus
18th November 2008
This document is an appraisal of the orbital corridor to validate the assumptions of the RTS and progress the development of orbital transport around EDinburgh.
Strategy Documents - Bus
18th November 2008
This environmental appraisal assesses the potential environmental impact of the five options (and sub-options) that have been chosen for the Edinburgh Orbital Bus Projecxt (EOPB)
Strategy Documents - Bus
13th May 2008
RTPI SEStran Feasibility Report Update, 13 May 2008
Strategy Documents - Bus
30th April 2007
Full Report with Appendix A and B.
SEStran wish to provide real-time passenger information across the SEStran area. The report is the result of extensive consultation with potential system partners throughout the SEStran area. The report ultimately recommends an appropriate strategy to deliver effective, robust and economically viable RTPI across the SEStran area.
Strategy Documents - Bus
01st May 2007
Full Report with Appendix C to K.
SEStran wish to provide real-time passenger information across the SEStran area. The report is the result of extensive consultation with potential system partners throughout the SEStran area. The report ultimately recommends an appropriate strategy to deliver effective, robust and economically viable RTPI across the SEStran area.